Calculate villa construction costs
Review the area, specification, slope and extras model, with worked examples for 150–300 m² villas.
Lizaz insights
Clear answers, practical checklists and authoritative sources for real estate, development and construction decisions.
Start with your question
Review the area, specification, slope and extras model, with worked examples for 150–300 m² villas.
Use the worksheet to compare quoted amounts, exclusions and additional costs.
Work through 12 checks covering title, planning, access, utilities and development costs.
Assess planning use, freight access, power capacity and ground conditions together.
Review documents, authorisation, budgeting and handover from an overseas investor’s perspective.
Read the summary and 12-page report of a real rural land study with identity and prices redacted.
Lizaz · Worked guides
Three worked scenarios for site preparation, progress valuation and change budgets, with explicit assumptions.
Compare two plots using a worked site preparation budget, utility allowances and an evidence checklist before a land decision in Türkiye.
Read the calculation and checklist ↗A worked progress valuation for owners building in Türkiye from abroad: weighted work packages, a TRY 800,000 period difference and evidence checklist.
Read the calculation and checklist ↗A villa change register with a worked budget: approved additions, an agreed omission, pending scope and the difference between budget headroom and approval.
Read the calculation and checklist ↗See how planning, access, terrain, comparable, development and income decisions are combined in a real assignment. Property identity and actual prices have been redacted.
Explore and download the reportA practical framework for investors in Turkey who are outside the country: timezone-safe decisions, documented reporting and risk-mapped progress.
Read guideA practical checklist covering title, planning, road access, utilities, ground conditions, development cost and exit strategy.
Read guideHow to assess permitted use, energy and utility capacity, environmental approvals, logistics and future expansion before selecting an industrial site.
Read guideCompare villa construction quotes using the same area, specification, exclusions and handover scope. Free worksheet and a worked budget example for Türkiye.
Read guideA guide to custom villa construction in Sapanca and Kartepe: documented BoQ assumptions, scheduled visual reporting and written change control under one project framework.
Read guideA technical guide to industrial land acquisition, high-voltage power allocation, seismic foundation engineering and Build-to-Suit (BTS) factory development in Kocaeli.
Read guideA guide to villa construction in Sapanca, Kartepe and Maşukiye: site investigation, current planning checks, BoQ cost assumptions and scope-controlled delivery.
Read guideHow overseas investors can coordinate villa projects in Turkey: appropriate authority documents, scheduled visual reporting, written change control and progress-linked payment checkpoints.
Read guideDeveloping heavy steel factories, warehouses and logistics hubs across Kocaeli, Gebze and Sakarya: ground bearing engineering, high-voltage substations and turnkey EPC delivery.
Read guideDo you have a site, building or investment decision?