Manage a Türkiye property or construction project from Europe.

A remote-first route for European residents who need verifiable decisions, written approvals and scheduled site reporting in Türkiye.

Can the project be coordinated from Europe?

Yes. A client living in Europe can commission a Türkiye-based feasibility, construction or renovation review without losing visibility of the project. Lizaz structures the work around a verified starting file, written scope and exclusions, milestone approvals, scheduled photo and video reporting, and project-specific handover records.

Built for cross-border decisions.

This is an English-language route for people based in the countries below who are considering a project in Türkiye. It does not claim local Lizaz offices in those countries.

  • Germany
  • United Kingdom
  • Netherlands
  • Belgium
  • France
  • Austria
  • Switzerland
  • Sweden
  • Norway
  • Denmark

The questions to answer before distance becomes risk.

01

Can I build a villa in Türkiye while living in Germany or the UK?

A remote workflow is possible when the parcel, planning position, authority requirements, design scope, budget assumptions and decision rights are documented before site work begins.

02

How can I check land in Türkiye from Europe?

Start with the parcel identity and official planning records, then test access, utilities, ground and environmental constraints, development capacity, total cost and exit scenarios.

03

How is construction progress verified from abroad?

Use a dated reporting calendar, milestone evidence, written change approvals, quantity and invoice records, and inspection or handover documents matched to the agreed scope.

One decision chain, four technical scopes.

01

Land and development feasibility

Turn parcel, planning, access, infrastructure and budget inputs into a decision file before commitment.

Explore service ↗
02

Remote project coordination

Keep scope, programme, approvals, progress evidence and change decisions visible across time zones.

Explore service ↗
03

Turnkey construction

Coordinate design, procurement, site delivery, quality checks and handover under a written project scope.

Explore service ↗
04

Renovation and transformation

Plan existing-building upgrades around measured conditions, intended use, approvals and delivery constraints.

Explore service ↗

From the first file to a controlled handover.

  1. 01

    Share the starting file

    Send the location or parcel reference, objective, target programme, budget range and available drawings or photographs.

  2. 02

    Verify before pricing

    Confirm the property, planning, physical and technical facts that materially affect scope and feasibility.

  3. 03

    Set decision gates

    Agree deliverables, exclusions, reporting rhythm, approval authority, change control and payment milestones in writing.

  4. 04

    Report and hand over

    Track progress with dated evidence and close the agreed scope with project-specific records and outstanding-item control.

Clear answers, no false promises.

Final advice must use the current documents and conditions of the specific property or project.

Does Lizaz have offices in European countries?

Lizaz is based in Kartepe, Kocaeli, Türkiye. This page serves clients who live in Europe and need work coordinated for a project located in Türkiye; it does not claim a European branch office.

Which European countries can use the remote workflow?

The English-language workflow is designed for enquiries from Germany, the United Kingdom, the Netherlands, Belgium, France, Austria, Switzerland and the Nordic countries. Project acceptance depends on the Türkiye location, scope and available documents, not the client's country alone.

Can every stage be completed without travelling to Türkiye?

Many review, reporting and approval steps can be handled remotely. Land registry, notarisation, banking, official applications or project-specific inspections may still require the owner, an authorised representative or a licensed professional.

Does remote reporting remove construction or investment risk?

No. Reporting and approval controls reduce information gaps; they do not remove title, planning, currency, procurement, programme, construction or market risk.

Verify the current rules before acting.

These primary sources explain the official property route. Project-specific legal, valuation and regulated advice remains the responsibility of the relevant authorised professional.

Based in Europe and considering a project in Türkiye?

Start with the location, objective and available records.

Send an international project brief ↗