Kartepe and Sapanca villa and construction cost calculation scenario

2026 villa and
construction cost calculator.

Build a preliminary budget from floor area, specification and optional extras. Review the scope and calculation basis on the same page.

Budget · excl. VAT8.36 – 10.62 million ₺Result ↓
2026 engineering & planning model

Calculate your construction budget transparently

Select floor area, specification and terrain. Review a 4-phase engineering cost breakdown from structural frame to custom cabinetry and mechanical systems.

Assumptions and scope ↓
Project type
m²

Enter the combined enclosed floor area of all storeys, rather than plot area.

120 m²800 m²
Specification level & finishes
Site slope and terrain
Basement requirement

Basement includes waterproof reinforced retaining walls, tanking and perimeter subsoil drainage.

Optional villa amenities
Preliminary Construction BudgetTRY · excl. VAT
Lower bound8,358,800 ₺
Upper bound10,618,000 ₺
€≈ 201,417 – 255,855 € · 953 €/m²
Average: 39,535 ₺/m² · 240 m²
4-Phase Engineering Cost BreakdownFrom Structure to Turnkey Delivery
Structural Shell & Foundation36% Structure
2,634,768 – 3,235,680 ₺

C30/35 ready-mix concrete, rebar reinforcement, formwork, and foundation tanking waterproofing.

Finishes & Lizaz Custom Joinery34% Finishes
2,488,392 – 3,055,920 ₺

Natural stone facade, rockwool insulation, Lizaz Kitchen marine-plywood cabinetry, doors and premium tiling.

Mechanical & Underfloor Heating18% MEP
1,317,384 – 1,617,840 ₺

Underfloor heating circuitry, heat pump infrastructure, sanitary installations and smart electrical automation.

Design, Permits & Supervision12% Management
878,256 – 1,078,560 ₺

Architectural/structural permit drawings, geotechnical investigation, site supervision, and statutory fees.

Building & Site Shell
7,318,800 – 8,988,000 ₺
Pool
480,000 – 680,000 ₺
Automation and security
180,000 – 280,000 ₺
Stone facade and fireplace
220,000 – 350,000 ₺
Landscaping
160,000 – 320,000 ₺

Turn this scenario into a verified proposal

Let’s start the preliminary site inspection and quantity survey based on your parcel.

Get Breakdown via WhatsApp ↗
WhatsApp button connects directly to Lizaz Project Coordination desk; you can review before sending.

This budget represents preliminary planning assumptions and transparent cost phases. Updated: . Methodology details →

150, 200, 250 and 300 m² villa cost examples

These examples use this page’s 2026 model for a villa on level ground without extras. Premium and Signature represent different material and equipment allowances. Land, VAT, design and permits, specialist ground works, pools and landscaping are excluded. These are not market research or quotations.

Total enclosed floor area × model unit allowance · TRY · level ground · excluding extras and VAT
Enclosed areaStructural shellPremiumSignature
150 m²2,025,000–2,475,0004,275,000–5,250,0006,000,000–7,800,000
200 m²2,700,000–3,300,0005,700,000–7,000,0008,000,000–10,400,000
250 m²3,375,000–4,125,0007,125,000–8,750,00010,000,000–13,000,000
300 m²4,050,000–4,950,0008,550,000–10,500,00012,000,000–15,600,000

Worked example for a two-storey, 200 m² villa

Two floors of 100 m² give 200 m² of enclosed floor area. The Premium model gives 200 × 28,500–35,000 TRY/m² = 5,700,000–7,000,000 TRY as a preliminary construction allowance. This example has no pool, landscaping or slope uplift; excluded costs are additional. Plot area cannot replace enclosed building area in this calculation.

Review the unit allowances and scope ↓

How is the preliminary budget calculated?

Enclosed floor area × unit allowance × slope factor + selected extras

The unit allowances below are planning assumptions defined for a 2026 scenario, not live prices, a valuation or a binding quotation. The methodology was updated on 5 September 2026; this does not indicate independent verification of market prices.

Model unit allowances · TRY/m² · excluding VAT and extras
Project typeStructural shellPremiumSignature
Detached villa13,500–16,50028,500–35,00040,000–52,000
Steel factory / warehouse8,500–11,00016,000–21,00023,000–31,000
Bungalow / rural hospitality15,000–18,50032,000–41,00046,000–58,000

What changes between packages

Structural shell covers an allowance for structure and envelope. Premium uses a higher allowance for finishes and services. Signature increases the material and equipment specification. Pools, landscaping, automation and solar are never automatically included; each selected extra is added once.

Outside the allowance

Land, VAT, design/permits, finance, off-site connections and specialist ground improvement are assessed separately. Process equipment, cranes, industrial fire systems, basements and retaining structures require project-specific quantities.

Slope and extras

The model uses ×1 for level sites, ×1.07 for gentle slopes and ×1.18 for steep slopes. This factor applies only to the building allowance; extras are added separately. The size, capacity and specification of each extra are determined during quotation.

How to use the official references

The Ministry’s approximate building unit costs are a reference for architectural and engineering service fees; they are distinct from this calculator’s package assumptions. Project decisions require the current communiqué, site data and competent-authority requirements.

Questions about your cost estimate

Where do these figures come from?

The figures are fixed scenario assumptions used in Lizaz’s 2026 planning model. They are not live market data or an official tariff. The methodology table lists the unit allowances; current pricing must be checked against the project scope and dated supplier quotations.

What is included and excluded?

The selected specification, enclosed floor area, slope factor and checked extras enter the calculation. Land, VAT, design and permit fees, finance, off-site utility connections and specialist ground improvement are excluded. Pools, automation, landscaping and other extras are selected separately for every package, including Signature.

Should I enter plot area or building area?

Enter the combined enclosed floor area of all storeys. For example, two floors of 120 m² each give 240 m². Storey count, basements, shared areas and open terraces require project-specific assessment; this tool does not calculate planning entitlement.

Is this a contract price or a programme guarantee?

No. A quotation and programme follow a review of current records, ground investigation, drawings, quantities, exclusions and procurement conditions. Price adjustments and change approvals are defined in the written agreement.

Can I request an initial review from abroad?

Yes. Start with the location, intended use and any parcel reference. Required documents, authorisations and site inspections depend on the file. The scope of remote coordination and reporting schedule are agreed in writing.

From allowance to project decision

Do two construction quotes cover the same work?

Use the worksheet to compare quoted amounts, exclusions and additional costs.

Compare construction quotes

Who coordinates villa construction?

Review design, construction, quality checks and handover scope for projects in Kartepe and Sapanca.

Turnkey villa construction

What should I check before buying land?

Work through 12 checks covering title, planning, access, utilities and development costs.

12 land purchase checks

For your site and project goals

Let’s define the next step.

Share your project brief ↗