Short answer

A zoning status certificate (imar durumu belgesi, often called imar çapı) is the official document showing how much and what kind of building a parcel can take. Read the permitted use first, then the TAKS and emsal ratios, the permitted height and the setbacks; the plan notes carry the extra conditions and exceptions. The certificate is not a building permit: construction still needs approved designs and a permit.

1. What the certificate is and who issues it

The Planned Areas Zoning Regulation defines the certificate as the document that sets out the use decisions and building conditions for a parcel under the Law, the implementation plan, its plan notes and the Regulation, and shows the zoning parcel with its boundaries and dimensions.

It is issued by the authority that grants building permits: the municipality for most parcels, and the zone management inside an organised industrial zone. The Regulation requires the authority to issue it within two working days of the application.

Municipal online zoning lookups are useful for a first view. For a purchase, a design or a permit, rely on the current certificate issued by the authority together with the plan notes.

2. Start with the permitted use

The first line to read is the planned use: housing, commerce, tourism, industry or another function. If your intended building does not fall within that use, generous ratios mean little.

Where no implementation plan exists, the certificate may not be issued at all. For village and rural parcels, ask the relevant authority for a written statement of the building conditions.

3. TAKS and emsal: a worked example

TAKS (ground coverage ratio) is the ratio of the building footprint to the zoning parcel area. Emsal, also written KAKS (floor area ratio), is the ratio of the total area of all built floors to the zoning parcel area.

The Regulation leaves some areas outside the emsal calculation and caps their total at 30 per cent. Which areas count depends on the design; the final figure is calculated at architectural design stage.

On sloping land, note that the Regulation’s TAKS definition assesses basement floors left above ground by the slope together with the ground-floor footprint. On hillside parcels in Kartepe and Sapanca this directly affects the footprint you can use.

  • Parcel area 1,000 m² and TAKS 0.15: the building footprint can be at most 150 m².
  • The same parcel with emsal 0.30: the floor area counted in emsal can be at most 300 m².
  • That 300 m² can be two floors of 150 m² or another split; the height and storey limits set the boundary.

4. Height, storeys and setbacks

The certificate states a building height (Yençok or Hmaks) or a number of storeys. Setbacks show how close the building may come to the parcel boundaries.

Unless the implementation plan says otherwise, the Regulation sets the front setback at a minimum of 5 metres and the side and rear setbacks at a minimum of 3 metres. For buildings above four storeys, side and rear setbacks increase by 0.50 metres for each storey above the fourth.

Once setbacks are deducted, the remaining area can be smaller than the footprint TAKS allows. On narrow or triangular parcels the ratio on paper may not be usable on site.

5. Plan notes, land cessions and the development levy

Plan notes can add conditions on roofs, basements, parking, minimum parcel size or frontage, and can change the general values on the certificate. Do not decide without reading the certificate and the plan notes together.

If the parcel has not yet been through land readjustment, deductions may be made for roads, parks and similar public uses. The Zoning Law provides that the development readjustment share cannot exceed forty-five per cent of the area before readjustment. The title-deed area and the net buildable parcel area can therefore differ.

6. Checklist before buying land

  • The date of the certificate and any later or pending plan change
  • Annotations, declarations, mortgages and shared ownership on the title record
  • Whether land readjustment has been applied and what may still be ceded
  • Road frontage, actual access, electricity, water and wastewater connections
  • Slope, ground conditions and retaining needs, and their effect on the footprint
  • Whether the massing allowed by TAKS, emsal, height and setbacks meets your brief

Quick answers

Does a zoning status certificate replace a building permit?

No. It shows the building conditions for the parcel. Construction requires approved designs and a building permit from the relevant authority.

What does emsal 0.30 mean?

The floor area counted in emsal cannot exceed 30 per cent of the parcel area. On a 1,000 m² parcel that is 300 m²; areas excluded from emsal are calculated separately under the Regulation and the plan notes.

Is an online zoning lookup enough for a purchase decision?

It is useful as a first check but not sufficient. Review the current certificate issued by the authority, the plan notes and the title record together.

Does Lizaz issue zoning status certificates?

No. Only the competent authority issues them. Within a land feasibility review, Lizaz reads the certificate together with title, site and cost information and turns it into a building scenario.

Continue with structured decisions

What should I check before buying land?

Work through 12 checks covering title, planning, access, utilities and development costs.

12 land purchase checks

How does a parcel feasibility review start?

See how documents and site conditions inform use scenarios and a written decision note.

Land feasibility service

What does a feasibility deliverable look like?

Read the summary and 12-page report of a real rural land study with identity and prices redacted.

Sample feasibility report

Official sources

Current documents and competent authority information should always be used for a project decision.

This content is for general information only and does not replace legal, financial, valuation or competent-authority advice. Every property and project must be assessed against its current documents.